A M Water Services Limited — Integrated Management System

APP_19 · Approved Supplier Register

Reference
APP_19
Issue
9
Issue date
26 September 2026
Owner
Leanne Mason (Director — Finance/Admin)
Approved by
Aaron Mason, Managing Director
Review
22 September 2027
ISO
9001 8.4.1–8.4.3 · 14001 8.1 · 45001 8.1.4
Status as at
27/09/2026
Every approved supplier of products and services, with the category, the scope of what they supply, the status and the basis the approval rests on. Labour-supply subcontractors are held in the live Excel, not here.
32Suppliers on the register
18Active — in current use
13Inactive — account retained
14Categories
0Failed a check at the 2026 review
RefSupplier and scopeCategoryStatusLast reviewed

The document

Purpose

This register is the controlled record of every approved supplier of products and services used by A M Water Services Limited, with the scope of what each supplies, the status and the basis the approval rests on. It carries the criteria for evaluating, selecting, monitoring and re-evaluating external providers under Clause 8.4.1, the type and extent of control applied to each kind of supply under 8.4.2, and what AMWS communicates to a supplier before an order is placed under 8.4.3.

Evaluation criteria

Four checks, and AMWS answers all four from its own records. None requires the supplier to send anything, and none asks AMWS to verify something it has no sight of.

#CheckWhere the answer comes from
1Have we used them in the last twelve months?Purchase and invoice records
2Did they supply what was ordered, when the job needed it?AMWS’s own experience of the work
3Has any quality, safety or environmental issue been attributed to them?APP_21 and the incident records
4Is there any unresolved invoicing dispute?Xero and the purchase ledger

When they are applied:

At the annual review, currently each September, for every supplier on the register
On engaging a new supplier, before the first order
At any time, if an issue arises. The review does not wait for September.

Recorded against SOP 5.3 Evaluation & Approval of Suppliers & Subcontractors.

The outcome is a status, not a grade

StatusMeaning
ActiveIn current use. Continue.
InactiveAccount retained, not currently used. No action. Re-checked if AMWS starts using them again.

There is no performance rating. Grading a builders’ merchant as Excellent rather than Good recorded a judgement AMWS was not measuring anything to support, and it made no difference to any decision.

Until Issue 9 the register carried six rating criteria with three bands each, an eight-question supplier self-assessment, a five-point star rating and a risk band. For a business of this size, reviewed by one Director, that produced a form filled in to satisfy itself: every supplier scored well, every self-assessment came back with eight ticks, and no decision ever turned on the result. The self-assessment also recorded a supplier’s own word about their internal risk assessments and training records as if it were verified evidence.

Re-evaluation

Clause 8.4.1 requires criteria for re-evaluation as well as for evaluation and selection. Re-evaluation uses the same four checks. What changes is when it is carried out and what it can decide.

TriggerWhat is re-evaluatedWhere the outcome is recorded
The annual review, each SeptemberEvery supplier on the register, against the four checksStatus confirmed or changed on this register, and the year’s record at SAR
An issue attributed to a supplierThat supplier, at the point the issue is raisedOn the APP_21 entry, and on this register if the status changes
A change in what a supplier supplies, or a new category of workThe new scope only, before the first order against itScope and category updated on this register
An inactive supplier being brought back into useThat supplier, against all four checks, before the first orderStatus moved to Active on this register

What a re-evaluation can decide:

OutcomeThe test
Continue as ActiveAll four checks answered yes
Move to InactiveCheck 1 answered no, with nothing outstanding on checks 2 to 4. The account is retained
Remove from the registerThe supplier has ceased trading, or has merged into another supplier already on the register, or a Director has decided not to use them again. Recorded in the change-log

An inactive supplier is re-evaluated against check 1 only. An account that has not been used cannot have failed checks 2 to 4, and check 1 is what holds the status at Inactive.

Type and extent of control

Clause 8.4.2 sets the control by what the supplier provides and what it could affect. AMWS buys in four kinds of supply and the verification differs for each.

What is suppliedWhat it could affectControl appliedHow it is verified
Materials, aggregates, PPE and consumables delivered to site or to the yardConformity of the reinstatement or installation, and the specification the job requiresOrdered against a purchase order stating the product, the specification and the quantity requiredThe delivery is checked against the order and the delivery note on receipt. A delivery that does not match the order is rejected or returned
Plant, tool and equipment hireSafety of the operator and of anyone near the work, and the PUWER and LOLER duties on AMWS as the userHired only from a supplier on this registerFor lifting equipment the hire company’s current test certificate is with the item for the duration of the hire, under SOP 8.6. AMWS does not extend its own examination certificates to hired plant
Plant and vehicle servicing, repair and statutory examinationRoadworthy and safe condition of AMWS plant and vehicles, and the LOLER examination intervals on the grab cranes and lifting accessoriesPlaced only with a supplier on this register, against the interval the asset is dueThe service, repair or thorough-examination record is returned by the supplier and held against the asset in APP_14
Training delivered to AMWS operativesCompetence for the work, and the statutory training duties on APP_10Placed only with a provider accredited for the scheme the certificate or card is issued underThe certificate or card received is entered on APP_12

Labour supplied by subcontractors carries out AMWS work to AMWS’s own RAMS and under AMWS supervision, controlled through SOP 5.1 and the site paperwork rather than through this register.

Information given to external providers

Clause 8.4.3 asks what is communicated to a supplier, and that it is adequate before it is sent.

What is communicatedWhenSet out in
What is required: the product or service, the specification, the quantity, and the site and date it is neededOn the purchase order, before the order is placedSOP 5.3
Site requirements, where the supplier attends an AMWS site: the RAMS for the work, the PPE required and the site rulesBriefed before arrival on siteSOP 5.1
For hired lifting equipment, that the current test certificate must be with the item for the whole of the hireAt the point of hireSOP 8.6
For training, the scheme or standard the certificate or card must be issued underAt bookingSOP 4.2
Where a delivery or a service does not meet the order, what is wrong with it and what is required insteadRaised with the supplier at the time by the person who placed the orderSOP 5.3

Orders are placed through one route, the Director (Finance/Admin), so a supplier deals with the same person for the order, the delivery and the invoice. AMWS carries out no verification activity at a supplier’s premises: what is supplied is verified on receipt or before first use, as above.

2026 annual review

Reviewed by Leanne Mason, 22 September 2026. All 32 suppliers were reviewed against the four checks.

OutcomeCount
Active — in current use, continuing18
Inactive — account retained, not currently used13
Merged — Sixfields Aggregates into the Storefield group1
Total on register32

No supplier failed a check. Every active supplier was used during the period, supplied what was ordered, has no quality, safety or environmental issue recorded against it on APP_21, and has no outstanding invoicing dispute. The review record, showing each supplier against each check, is at 2026 Supplier Annual Review.

Labour-supply subcontractors are not held here

Individual subcontractors are held in Leanne Mason’s live Approved Supplier Register (Excel), which is the master record. This portal carries the summary figures only. They are engaged under SOP 5.3, which requires public liability insurance, the tickets and cards for the work and right-to-work evidence on file before the first engagement.

StatusCount
Active — currently engaged or available46
Not to be re-engaged16
Total on the live register62

Not to be re-engaged is an operational flag, not a performance grade: it stops someone being booked without a Director decision. Subcontractors carrying it stay on the register so the decision is visible rather than forgotten.

The live Excel still carries the Excellent / Good / Do Not Use columns this register has stopped using. They are retired at the next refresh of that register so the two match. Owner: Leanne Mason, with the January subcontractor review.

Review schedule

SeptemberSuppliers of products and services. The 2026 review was held on 22 September 2026.
JanuaryLabour-supply subcontractors.
At any timeOn an issue, a complaint or a change of scope. The review does not wait for the annual date.

Responsibilities

RoleResponsibility
Leanne Mason
Director — Finance/Admin
Maintains the live register, carries out the annual review, processes new applications and approves additions and removals
Sean Ashton
HSQE Consultant
Maintains the controlled summary on the portal and the annual-review evidence
Aaron Mason
Director
Decides re-engagement where a subcontractor carries the not-to-be-re-engaged flag

How this document is approved

Approved by the Directors. The annual review is carried out by Leanne Mason each September and recorded as a dated SAR document, and the outcome is an input to the annual Management Review.

Related documents

Revision history

IssueDateApproved byChange
301/04/2026Sean Ashton, HSQE ConsultantPre-2026-SAR refresh prep: standardised doc-control header and downloadable companion file added in readiness for Leanne's 16 April 2026 annual review.
416/04/2026Leanne Mason2026 annual SAR completed for all approved suppliers — all rated Excellent, no complaints logged during review period. Per-supplier 2026 SAR pages added under suppliers/sar-2026/. 2025 SAR pages retained under suppliers/sar-2025/ as year-on-year evidence.
513/05/2026Sean Ashton, HSQE ConsultantReference-pointer pattern restored. Master-source callout corrected: this page is the controlled reference + annual-review summary; Leanne's live Excel is the master record. Aligns with the pre-2026 "reference appendix" pattern. No data changes — same 32 approved suppliers, same 62 labour-supply subcontractors, same 16/04/2026 SAR review.
613/05/2026Sean Ashton, HSQE ConsultantPerformance Rating Criteria section added — explicit 3-band rubric (Excellent / Good / Do Not Use) against 6 criteria (Quality, Delivery, Communication, HSE/Compliance, Documentation, Outcome). Mid-cycle downgrade and "Do Not Use" re-engagement processes formalised. APP_12 typo in "Master record location" callout corrected to APP_19. Wide-mode tip and duplicate bottom "Local controlled copy" callout removed. Orphan .docx deleted.
719/05/2026Sean Ashton, HSQE ConsultantApproved Supplier Register migrated to an HTML-based register during the 2026 internal audit cycle (alongside IA202604 Operations, 28/04/2026, and the wider IMS proportionality pass). New register has 8-point Supplier Self-Assessment, status (Active / Inactive / Merged), scope, approval method, last-review date and risk rating per supplier. Single page with search / filter / expandable detail. Replaces the per-supplier SAR markdown set (32 files retired) which was disproportionate for a ~20-person SME and held criteria AMWS could not realistically evidence. The new register holds the criteria AMWS can verify (Companies House status, publicly visible accreditations, sector positioning) plus the supplier's annual 8-point self-confirmation. Active list reflects the 19/05/2026 confirmation by Leanne Mason: 18 Active / 13 Inactive (account retained, not currently used) / 1 Merged (Sixfields → Storefield). Prior-year 2025 SAR markdown set retained as historical evidence.
809/09/2026Sean Ashton / Aaron MasonCross-reference pass — no change to substance. A system-wide document-control pass on 09/09/2026 added a Related documents section to every controlled document that lacked one, so the thread from a policy commitment to the procedure that delivers it and the record that evidences it can be followed in either direction. Nothing in the substance of this document changed. Recorded on the audit trail because the document content changed, even though the requirements it sets did not. A supporting standard reference was added in the same pass, naming the standard this document is built against and citing it undated so a new edition does not force a re-issue.
926/09/2026Sean Ashton / Aaron MasonPerformance grading removed and the register rebuilt on a proportionate basis. The six rating criteria with three bands each, the five-point star rating, the risk band and the eight-question supplier self-assessment are withdrawn. A supplier is now Active or Inactive. Evaluation is against four checks AMWS answers from its own records — used in the year, supplied as ordered, no issue attributed, no invoicing dispute — none of which requires anything from the supplier. The reason: every supplier scored well every year, no decision ever turned on the result, and the self-assessment recorded the supplier's own word about their internal risk assessments and training records as if it were verified evidence. The supplier list is now a markdown table on this page, so APP_19 is the controlled master and the HTML register is a generated view of it, matching every other register in the system. The 2026 annual review is written up as a record at SAR 2026; 2025 had 32 per-supplier files and 2026 previously had none, so the year-on-year trail was broken. Reviewed by Leanne Mason on 22/09/2026: all 18 active suppliers confirmed still in use and continuing, 13 inactive, 1 merged. Clause 8.4 documented across its three sub-clauses — the triggers for re-evaluation and what a re-evaluation can decide (8.4.1), the type and extent of control set by what each kind of supplier provides (8.4.2), and what AMWS communicates to a supplier before an order is placed (8.4.3).
Generated from the controlled source on the AMWS IMS portal. Issue 9, 26 September 2026. Uncontrolled when printed.