A M Water Services Limited — Integrated Management System

APP_01 · Context & Interested Parties Register

Reference
APP_01
Issue
5
Issue date
27 September 2026
Owner
Sean Ashton (HSQE Consultant)
Approved by
Aaron Mason, Director
Review
22 September 2027
ISO
9001 4.1 / 4.2 · 14001 4.1 / 4.2 · 45001 4.1 / 4.2
Status as at
27/09/2026
Every interested party AMWS has identified, scored on relevance and influence, with the issues that bear on it, what it requires, how AMWS monitors it and which IMS processes respond.
12Interested parties
2Critical — Director oversight
7High — Director oversight
3Medium
1Low
RefInterested partyScorePriorityWhat they require

The document

Purpose

This register records the external and internal issues relevant to A M Water Services Limited’s purpose under Clause 4.1, and the interested parties relevant to the management system under Clause 4.2, with what each requires and how AMWS responds.

How a party is scored

Priority scores are calculated using: Relevance (1-4) × Power/Influence (1-4) = Total Score (1-16)

  • Relevance: How much the party affects our operations (1=Low, 4=Critical)
  • Power: Their ability to influence our business (1=Low, 4=High)

Priority levels and what each triggers

Priority LevelScore RangeAction RequiredReview FrequencyEscalationDashboard Metrics
Critical13-16Immediate action plans, Director oversightTwice a yearDirectors• Contract KPIs<br>• HSE compliance score<br>• Days since incident
High9-12Active management, regular monitoringTwice a yearDirectors• Audit findings<br>• Staff turnover<br>• Supplier performance
Medium5-8Standard procedures, periodic reviewAnnuallySite Supervisor• Complaints logged<br>• Insurance claims<br>• Fleet compliance
Low1-4Routine monitoringAnnuallySite Supervisor• Training compliance<br>• Membership status

Any party at any priority is reviewed by exception at the standing weekly compliance call whenever something changes. The review record below is the evidence.

Review record — Critical and High, reviewed twice a year

Each row records what went in to the review and what came out of it.

PartyPriorityLast reviewedInputs consideredOutputsNext due
C&IP-001 Water CompaniesCritical09/09/2026Framework performance; WIRS accreditation status; Water (Special Measures) Act pass-through clauses appearing in contract wording; client supplier-audit responsesNo change to score. Pass-through risk carried in APP_05 R-10. Spill-reporting obligations confirmed reflected in SOP 8.122/03/2027
C&IP-002 HSECritical09/09/2026APP_10 Issue 4 QC; the eighteen risk assessments reissued 04/09/2026; RIDDOR position — no reportable events in the periodScore unchanged, but the review found gaps the register had not surfaced: no fire risk assessment, no documented DSE assessment, no first aid needs assessment. All three now carried as legal-register entries with owners and dates22/03/2027
C&IP-004 Environment AgencyHigh09/09/2026Waste carrier registration (valid to 12/08/2028); duty-of-care records; APP_06 Issue 4 aspect reviewNo change to score. APP_06 action list cut to legal and regulatory drivers; oil-storage threshold question opened22/03/2027
C&IP-005 Employees & OperativesHigh09/09/2026Employment Rights Act 2025 commencement dates verified against the made regulations; RA_HO_08 wellbeing review; MHFA cover; HSQE Culture Audit, first cycle held 22/09/2026Two actions raised. Contract and handbook pack to be updated for the in-force ERA 2025 tranche (Leanne Mason, 31/10/2026). Harassment risk assessment brought forward to 23/10/2026 so it lands before the duty strengthens on 30/10/202622/03/2027
C&IP-006 Certification Body — Alcumus ISOQARHigh09/09/2026Surveillance audit confirmed for 6–8 October 2026; ISO 14001:2026 transition; open CARsNo change to score. APP_25 transition plan complete, closing the action carried since April. Audit plan published at 2026-10 Surveillance Audit22/03/2027
C&IP-007 Suppliers & SubcontractorsHigh09/09/2026APP_19 annual supplier review; PPE limb (b) question raised by RA_HO_15; PFAS disclosureOne action raised. Which labour-supply arrangements bring workers inside the limb (b) PPE duty is unresolved — Leanne Mason and Sean Ashton, 31/12/202622/03/2027
C&IP-008 ICOHigh09/09/2026DUAA 2025 amendments; ICO registration currency; POL_HSQE_09 reissued 04/09/2026; breach log — no notifiable eventsNo change to score. Retention schedule identified as absent and carried to 31/03/202722/03/2027
C&IP-013 KierHigh09/09/2026Under consideration; operations anticipated from late October 2026, terms and assurance pack not receivedNew entry. Requirements to be confirmed within 14 days of commencement — see the note aboveOn commencement, then 22/03/2027

Review record — Medium and Low, reviewed annually

PartyPriorityLast reviewedInputs consideredOutputsNext due
C&IP-009 Local Communities & PublicMedium09/09/2026Complaints received in the period; noise and dust aspects at APP_06; Considerate Constructors positionNo change. No complaints logged in the period22/09/2027
C&IP-010 Insurance CompaniesMedium09/09/2026Claims history; employers' liability certificate currency; cyber cover availabilityNo change to score. Employers' Liability (Compulsory Insurance) Act 1969 added to APP_10 as L64, which the register had not previously carried22/09/2027
C&IP-011 DVSAMedium09/09/2026O-Licence compliance; fleet maintenance and inspection records; Earned Recognition eligibility; RA_HO_12No change. Earned Recognition remains a watching brief at APP_10 L52a22/09/2027
C&IP-012 Trade AssociationsLow09/09/2026EUSR and WaterSafe membership status; CPD records in APP_13No change22/09/2027

What this record does not claim

The 09/09/2026 dates above record a single consolidated review carried out across the system in the first week of September 2026: the policy review of 03/09, the risk assessment reissue of 04/09, and the COSHH, legal register and appendix work of 08–09/09. They are not a claim that thirteen separate meetings took place. The register is reviewed as one piece of work because that is how a business of this size can run it.

Review and update process

Interested parties are reviewed on the cadence below, keyed to dates that already exist in the calendar:

PriorityReviewedAt
Critical (13–16) and High (9–12)Twice a yearThe September Management Review and a March mid-year check
Medium (5–8) and Low (1–4)AnnuallyThe September Management Review
Any party, any priorityBy exception, whenever something changesThe standing weekly Director / HSQE compliance call, using FORM_WCC_01

Most reviews happen by exception. A new client, a change in a client's requirements, a regulator contact, a complaint or a supplier failure is picked up at the weekly call in the week it happens. The twice-yearly and annual reviews confirm nothing has been missed and produce the record above.

A review is also triggered when:

  • Significant changes occur in the organisation's context
  • A major incident or complaint arises
  • A new interested party is identified
  • A regulatory change is announced
  • An audit finding recommends it

Review Actions:

  • Update external / internal issues
  • Reassess relevance and power scores
  • Review requirements and monitoring methods
  • Check integration with APP_05 Risk & Opportunity Log
  • Update dashboard metrics

Next full review: 22/09/2027 at the Management Review. Next twice-yearly review of Critical and High parties: 22/03/2027. Distribution: Directors, Management Team, HSQE Consultant.


This document forms part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.

For questions about this document, contact the HSQE Consultant or refer to the document locations listed above.

Responsibilities

RoleResponsibility
Aaron Mason · Leanne Mason
Directors
Own the Critical and High priority relationships and review them twice a year
Jason May
Supervisor
Monitors the Medium and Low priority parties in day-to-day operations
Sean Ashton
HSQE Consultant
Maintains the register, scores the parties and records each review

How this document is approved

Approved by the Directors. Critical and High priority parties are reviewed twice a year, the rest annually, and any party by exception at the standing weekly compliance call when something changes.

Related documents

Revision history

IssueDateApproved byChange
101/06/2024Aaron Mason, DirectorInitial issue.
219/09/2025Aaron Mason, DirectorFormatting refresh; doc-control header standardised; mid-cycle reissue.
301/06/2026Aaron Mason, DirectorReview cycle re-aligned to June IMS anniversary. 2 interested parties added: Ofwat (C&IP-003) and ICO (C&IP-008).
409/09/2026Aaron Mason, DirectorKier added; review record reinstated; cadence right-sized.
527/09/2026Aaron Mason, DirectorKier restated as business development under consideration, operations anticipated from late October 2026, matching the September 2026 Management Review. Presentation aligned to the shared register format.
Generated from the controlled source on the AMWS IMS portal. Issue 5, 27 September 2026. Uncontrolled when printed.