| Ref | Interested party | Score | Priority | What they require |
|---|
This register records the external and internal issues relevant to A M Water Services Limited’s purpose under Clause 4.1, and the interested parties relevant to the management system under Clause 4.2, with what each requires and how AMWS responds.
Priority scores are calculated using: Relevance (1-4) × Power/Influence (1-4) = Total Score (1-16)
| Priority Level | Score Range | Action Required | Review Frequency | Escalation | Dashboard Metrics |
|---|---|---|---|---|---|
| Critical | 13-16 | Immediate action plans, Director oversight | Twice a year | Directors | • Contract KPIs<br>• HSE compliance score<br>• Days since incident |
| High | 9-12 | Active management, regular monitoring | Twice a year | Directors | • Audit findings<br>• Staff turnover<br>• Supplier performance |
| Medium | 5-8 | Standard procedures, periodic review | Annually | Site Supervisor | • Complaints logged<br>• Insurance claims<br>• Fleet compliance |
| Low | 1-4 | Routine monitoring | Annually | Site Supervisor | • Training compliance<br>• Membership status |
Any party at any priority is reviewed by exception at the standing weekly compliance call whenever something changes. The review record below is the evidence.
Each row records what went in to the review and what came out of it.
| Party | Priority | Last reviewed | Inputs considered | Outputs | Next due |
|---|---|---|---|---|---|
| C&IP-001 Water Companies | Critical | 09/09/2026 | Framework performance; WIRS accreditation status; Water (Special Measures) Act pass-through clauses appearing in contract wording; client supplier-audit responses | No change to score. Pass-through risk carried in APP_05 R-10. Spill-reporting obligations confirmed reflected in SOP 8.1 | 22/03/2027 |
| C&IP-002 HSE | Critical | 09/09/2026 | APP_10 Issue 4 QC; the eighteen risk assessments reissued 04/09/2026; RIDDOR position — no reportable events in the period | Score unchanged, but the review found gaps the register had not surfaced: no fire risk assessment, no documented DSE assessment, no first aid needs assessment. All three now carried as legal-register entries with owners and dates | 22/03/2027 |
| C&IP-004 Environment Agency | High | 09/09/2026 | Waste carrier registration (valid to 12/08/2028); duty-of-care records; APP_06 Issue 4 aspect review | No change to score. APP_06 action list cut to legal and regulatory drivers; oil-storage threshold question opened | 22/03/2027 |
| C&IP-005 Employees & Operatives | High | 09/09/2026 | Employment Rights Act 2025 commencement dates verified against the made regulations; RA_HO_08 wellbeing review; MHFA cover; HSQE Culture Audit, first cycle held 22/09/2026 | Two actions raised. Contract and handbook pack to be updated for the in-force ERA 2025 tranche (Leanne Mason, 31/10/2026). Harassment risk assessment brought forward to 23/10/2026 so it lands before the duty strengthens on 30/10/2026 | 22/03/2027 |
| C&IP-006 Certification Body — Alcumus ISOQAR | High | 09/09/2026 | Surveillance audit confirmed for 6–8 October 2026; ISO 14001:2026 transition; open CARs | No change to score. APP_25 transition plan complete, closing the action carried since April. Audit plan published at 2026-10 Surveillance Audit | 22/03/2027 |
| C&IP-007 Suppliers & Subcontractors | High | 09/09/2026 | APP_19 annual supplier review; PPE limb (b) question raised by RA_HO_15; PFAS disclosure | One action raised. Which labour-supply arrangements bring workers inside the limb (b) PPE duty is unresolved — Leanne Mason and Sean Ashton, 31/12/2026 | 22/03/2027 |
| C&IP-008 ICO | High | 09/09/2026 | DUAA 2025 amendments; ICO registration currency; POL_HSQE_09 reissued 04/09/2026; breach log — no notifiable events | No change to score. Retention schedule identified as absent and carried to 31/03/2027 | 22/03/2027 |
| C&IP-013 Kier | High | 09/09/2026 | Under consideration; operations anticipated from late October 2026, terms and assurance pack not received | New entry. Requirements to be confirmed within 14 days of commencement — see the note above | On commencement, then 22/03/2027 |
| Party | Priority | Last reviewed | Inputs considered | Outputs | Next due |
|---|---|---|---|---|---|
| C&IP-009 Local Communities & Public | Medium | 09/09/2026 | Complaints received in the period; noise and dust aspects at APP_06; Considerate Constructors position | No change. No complaints logged in the period | 22/09/2027 |
| C&IP-010 Insurance Companies | Medium | 09/09/2026 | Claims history; employers' liability certificate currency; cyber cover availability | No change to score. Employers' Liability (Compulsory Insurance) Act 1969 added to APP_10 as L64, which the register had not previously carried | 22/09/2027 |
| C&IP-011 DVSA | Medium | 09/09/2026 | O-Licence compliance; fleet maintenance and inspection records; Earned Recognition eligibility; RA_HO_12 | No change. Earned Recognition remains a watching brief at APP_10 L52a | 22/09/2027 |
| C&IP-012 Trade Associations | Low | 09/09/2026 | EUSR and WaterSafe membership status; CPD records in APP_13 | No change | 22/09/2027 |
The 09/09/2026 dates above record a single consolidated review carried out across the system in the first week of September 2026: the policy review of 03/09, the risk assessment reissue of 04/09, and the COSHH, legal register and appendix work of 08–09/09. They are not a claim that thirteen separate meetings took place. The register is reviewed as one piece of work because that is how a business of this size can run it.
Interested parties are reviewed on the cadence below, keyed to dates that already exist in the calendar:
| Priority | Reviewed | At |
|---|---|---|
| Critical (13–16) and High (9–12) | Twice a year | The September Management Review and a March mid-year check |
| Medium (5–8) and Low (1–4) | Annually | The September Management Review |
| Any party, any priority | By exception, whenever something changes | The standing weekly Director / HSQE compliance call, using FORM_WCC_01 |
Most reviews happen by exception. A new client, a change in a client's requirements, a regulator contact, a complaint or a supplier failure is picked up at the weekly call in the week it happens. The twice-yearly and annual reviews confirm nothing has been missed and produce the record above.
A review is also triggered when:
Review Actions:
Next full review: 22/09/2027 at the Management Review. Next twice-yearly review of Critical and High parties: 22/03/2027. Distribution: Directors, Management Team, HSQE Consultant.
This document forms part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.
For questions about this document, contact the HSQE Consultant or refer to the document locations listed above.
| Role | Responsibility |
|---|---|
| Aaron Mason · Leanne Mason Directors | Own the Critical and High priority relationships and review them twice a year |
| Jason May Supervisor | Monitors the Medium and Low priority parties in day-to-day operations |
| Sean Ashton HSQE Consultant | Maintains the register, scores the parties and records each review |
Approved by the Directors. Critical and High priority parties are reviewed twice a year, the rest annually, and any party by exception at the standing weekly compliance call when something changes.
| Issue | Date | Approved by | Change |
|---|---|---|---|
| 1 | 01/06/2024 | Aaron Mason, Director | Initial issue. |
| 2 | 19/09/2025 | Aaron Mason, Director | Formatting refresh; doc-control header standardised; mid-cycle reissue. |
| 3 | 01/06/2026 | Aaron Mason, Director | Review cycle re-aligned to June IMS anniversary. 2 interested parties added: Ofwat (C&IP-003) and ICO (C&IP-008). |
| 4 | 09/09/2026 | Aaron Mason, Director | Kier added; review record reinstated; cadence right-sized. |
| 5 | 27/09/2026 | Aaron Mason, Director | Kier restated as business development under consideration, operations anticipated from late October 2026, matching the September 2026 Management Review. Presentation aligned to the shared register format. |