Field Value
Document Reference APP_22
Issue Number 4
Issue Date 9 September 2026
Next Review 1 June 2027
Controlled By Sean Ashton (HSQE Consultant)
Approved By Aaron Mason, Director

Download the register

The page below is the canonical record. The Excel is the same data as a downloadable snapshot: rolling accident / near-miss statistics, RIDDOR-reportable, lost-time, root-cause analysis. Feeds APP_11 KPI H1 (Zero Harm).

Download APP_22 (.xlsx)

Related: APP_07 Hazard Identification · APP_11 HSQE KPIs · APP_21 Non-Conformance Register

1. Purpose

This register maintains comprehensive accident and incident statistics for A M Water Services Limited to:

  • Track safety performance trends
  • Identify areas for improvement
  • Meet regulatory reporting requirements
  • Support management review processes
  • Demonstrate continuous improvement in safety performance

2. Scope

This register covers all work-related accidents, incidents, and near misses involving:

  • Employees
  • Contractors under our control
  • Visitors to our premises or sites
  • Members of the public affected by our operations

3. Definitions

Category Definition Reporting Requirement
Fatality Death resulting from work-related accident RIDDOR - Immediate
RIDDOR > 7 Days Injury causing absence from work for more than 7 consecutive days RIDDOR - Within 15 days
RIDDOR - DO Dangerous Occurrence as defined in RIDDOR Schedule 2 RIDDOR - Within 10 days
Lost Time < 7 days Injury causing absence from work for 1-7 days Internal reporting only
Non Lost Time Injury requiring treatment but no time lost Internal reporting only
Near Miss Incident with potential to cause injury but no actual harm Internal reporting only
Close Calls Unsafe conditions or behaviors identified before incident Internal reporting only
RTA's - No Injuries Road traffic accidents involving company vehicles with no injuries Insurance reporting

4. Historical Statistics (2023-2028)

Annual Summary Table

Category 2023 2024 2025 2026 2027 2028
Fatality 0 0 0 0 0 0
RIDDOR > 7 Days 0 0 0 0 0 0
RIDDOR - DO 0 0 0 0 0 0
Lost Time < 7 days 0 0 0 0 0 0
Non Lost Time 0 0 0 0 0 0
Near Miss 0 0 0 0 0 0
Close Calls 0 0 0 0 0 0
RTA's - No Injuries 0 0 0 0 0 0

Performance Analysis

What is good. Zero RIDDOR reportables, zero lost-time injuries, zero dangerous occurrences and zero road traffic accidents across three years of excavation, confined-space and highway working. For twenty field teams doing this kind of work that is a strong record.

Near misses and close calls. Both rows stand at zero across the three years. Twenty field teams working in trenches, on live carriageways and around live mains generate near misses, so zero is an absence of data rather than an absence of events.

Capture runs through the routes the crews already use — the Works group day to day and the operational NCR register held at the office, which is maintained as events happen. Both are reviewed at the weekly compliance call and anything reportable is recorded. This is objective H4 in APP_11, owned by Leanne Mason and Jason May. No numeric target is set on the crews: a count target produces reports written to hit a number rather than reports of what happened.

5. Key Performance Indicators

KPI Target Current Status RAG Status
RIDDOR Incidents 0 0 🟢
Lost Time Injury Frequency Rate (LTIFR) 0 0 🟢
Total Recordable Incident Rate (TRIR) < 1.0 0 🟢
Near misses and close calls recorded No count target; routes reviewed weekly 0 recorded to date 🟡

How the RAG status is set

RAG The test
🟢 Green The target is met.
🟡 Amber The arrangement is in place and being followed, but it has not yet produced the data the measure depends on.
🔴 Red The target is not met.

Near-miss and close-call reporting sits at amber on that test. The two capture routes are in use and reviewed at the weekly compliance call, and no report has yet come through them.

6. Incident Categories by Type

Water Industry Specific Hazards Monitoring

Hazard Category Incidents 2025 Incidents 2026 YTD Trend
Excavation/Confined Spaces 0 0 →
Working Near Live Mains 0 0 →
Highway Working 0 0 →
Manual Handling 0 0 →
Chlorination/Chemicals 0 0 →
Plant & Machinery 0 0 →
Slips, Trips & Falls 0 0 →
Vehicle Operations 0 0 →

7. Monthly Breakdown — Current Year (2026 YTD)

Month RIDDOR Lost Time Non Lost Time Near Miss Close Calls RTA
January 0 0 0 0 0 0
February 0 0 0 0 0 0
March 0 0 0 0 0 0
April 0 0 0 0 0 0
May (to 13/05) 0 0 0 0 0 0
June — — — — — —
July — — — — — —
August — — — — — —
September — — — — — —
October — — — — — —
November — — — — — —
December — — — — — —
Total YTD 0 0 0 0 0 0

2025 final totals retained: All categories closed at zero. See the annual summary in Section 4 above.

8. Benchmarking

Industry Comparison (Water Sector Average)

Metric AM Water Services Industry Average Performance
RIDDOR Rate 0.0 0.45 per 100,000 hours ✓ Above Average
LTIFR 0.0 1.2 per million hours ✓ Above Average
TRIR 0.0 2.8 per million hours ✓ Above Average

9. Management Review Requirements

This register shall be:

  • Updated monthly by the HSQE Consultant
  • Reviewed quarterly at management meetings
  • Presented annually at the Management Review
  • Used to identify trends and improvement opportunities
  • Submitted to customers as required for framework compliance
  • SOP 8.1 - Accident, Incident and Near Miss Reporting & Investigation
  • APP_05 Risk & Opportunity Log
  • FORM_ARF - Accident Report Form
  • FORM_NMRF - Near Miss Report Form

11. Notes

Reporting Obligations:

  • All RIDDOR reportable incidents must be reported to HSE within required timeframes
  • Monthly statistics to be communicated to all employees via toolbox talks
  • Customer-specific reporting requirements to be met as per contracts

Data Verification:

  • All statistics verified against accident report forms
  • Cross-referenced with absence records
  • Validated during internal audits

This document forms part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.

#TEAM - Together Everyone Achieves More

Our commitment to Zero Harm drives continuous improvement in safety performance

Audit trail

Issue Date Approved By Summary
1 01/06/2024 Aaron Mason, Director Initial issue.
2 01/06/2025 Aaron Mason, Director Annual review.
3 01/06/2026 Aaron Mason, Director Annual review — content reaffirmed. Calendar references rolled forward (2024 / 2025 → 2025 / 2026 YTD; Monthly Breakdown now shows current-year 2026 YTD with May cutoff at 13/05/2026). All categories remain zero across the 2025 full year and 2026 YTD — Zero Harm record maintained. Feeds APP_11 H1 KPI. Cross-references refreshed.
4 09/09/2026 Aaron Mason, Director Near-miss and close-call reporting restated. The register recorded both at 🟡 "to be improved" against targets of more than ten and more than twenty a month, when the actual figure has been zero for three years. That is an absence of data rather than an absence of events, and understating it left the most likely audit question unanswered. The two count-based KPIs were withdrawn and replaced with a single measure of whether the capture routes are in use and reviewed, banded against the RAG key on this page. The performance analysis is rewritten to separate reactive performance, which is genuinely excellent — zero RIDDOR, zero lost-time injuries, zero dangerous occurrences and zero RTAs across three years — from the reporting position, where zero recorded is an absence of data. Raised as objective H4 in APP_11 with no numeric target set until the cause is understood, and linked to the H&S culture survey owned for issue by 19/09/2026.

How this document is approved

This document is maintained under AMWS's continuous-compliance model. Substantive revisions are reviewed and signed off by the Directors at the standing weekly Director / HSQE compliance call (Sean Ashton, Onyx + Leanne Mason). Currency, cross-references and minor edits are checked at the monthly Onyx site visit. The annual Management Review (September) provides the strategic-level confirmation. Compliance is therefore continuous, not gated on a single annual meeting.


This document forms part of A M Water Services Limited's Integrated Management System. Paper copies are uncontrolled when printed.