Corrective Action Report 010¶
A M Water Services Limited¶
QEHS/NCR Ref: OBS-IA202507-01
Date: 25/09/2025
CAR ID: CAR-2025-010
Document Number: FORM_CAR001 Rev 1 ID 01/09/2025
Process/Area/Department: Environmental Management / Monitoring
Requirement/Clause No.(s): ISO 14001:2015 - Environmental Aspects
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Details of Nonconformity¶
Statement of Nonconformity: OBSERVATION: Fuel monitoring planned for Q4 2025 implementation. Current fuel consumption data collection relies on manual recording from fuel cards without systematic analysis of efficiency trends.
Planned Actions¶
Containment Action(s), including correction, with supporting completion date(s):
- Interim monthly fuel card analysis (31/10/2025)
- Accelerate telematics procurement (30/11/2025)
- Full telematics implementation (31/12/2025)
Root Cause¶
Primary Cause: Phased implementation approach prioritised other systems first Contributing Factors: Manual system providing basic data deemed adequate initially
Proposed Corrective Action¶
- Fast-track telematics system implementation.
- Establish baseline consumption data.
- Set reduction targets for 2026.
Verification¶
- [ ] Telematics operational on all vehicles.
- [ ] Monthly fuel efficiency reports showing trends.
Recommendations¶
- Driver efficiency training
- Route optimisation analysis
- Green driver recognition scheme
Feedback & Acknowledgments¶
Fleet team supportive of telematics for multiple benefits beyond fuel monitoring.
Corrective Action Report Prepared By¶
| CAR Prepared By | Signature | Position | Date |
|---|---|---|---|
| Sean Ashton | S. Ashton | HSQE Consultant | 25/09/2025 |
| CAR Reviewed By | Signature | Position | Date |
|---|---|---|---|
| Aaron Mason | A. Mason | Director | 25/09/2025 |
Corrective Action Close Out¶
Target Completion: 31/12/2025
| Corrective Action Completed | Signature | Position | Date |
|---|---|---|---|
| Actioned by | |||
| Verification By |
Status: OPEN