Corrective Action Report 004¶
A M Water Services Limited¶
QEHS/NCR Ref: OBS-IA202603-02
Date: 30/04/2026
CAR ID: CAR-2026-004
Document Number: FORM_CAR001 Rev 1 ID 01/09/2025
Process/Area/Department: Support / Training & Competence
Requirement/Clause No.(s): ISO 45001:2018 - Clause 7.2
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Details of Nonconformity¶
Statement of Nonconformity: OBSERVATION (rolled forward from CAR-2025-005 / -016): APP_12 Training Matrix and APP_14 Calibration & Equipment Log remain separate registers. A combined operator-equipment competency view linking specific operator qualifications to specific equipment authorisations would strengthen clause 7.2 evidence. Lower priority for the B2 audit; a 2026–27 IMS improvement candidate.
Planned Actions¶
Containment Action(s), including correction, with supporting completion date(s):
- Design a combined operator-equipment competency matrix linking APP_12 qualifications to APP_14 equipment authorisations (30/09/2026)
Root Cause¶
Primary Cause: Operator competence and equipment authorisation are tracked in two separate registers; no combined view yet exists. Contributing Factors: Small operative team — the link is currently held informally.
Proposed Corrective Action¶
- Build a single matrix mapping each operative's qualifications to the equipment they are authorised to operate.
- Decide whether this lives in APP_12, APP_14, or the new QualTrack tracker.
Verification¶
- [ ] Combined operator-equipment competency matrix exists and is populated.
- [ ] Sample operatives' equipment authorisations trace to a held qualification.
Recommendations¶
- Fold this into the QualTrack rollout rather than maintaining a third spreadsheet.
- Treat as a 2026–27 improvement — not required for the B2 surveillance audit.
Feedback & Acknowledgments¶
Raised by the 2026 internal-audit cycle (IA202603). Owner and target agreed at the standing weekly Director / HSQE compliance call.
Corrective Action Report Prepared By¶
| CAR Prepared By | Signature | Position | Date |
|---|---|---|---|
| Sean Ashton | S. Ashton | HSQE Consultant | 30/04/2026 |
| CAR Reviewed By | Signature | Position | Date |
|---|---|---|---|
| Aaron Mason | A. Mason | Director | 30/04/2026 |
Corrective Action Close Out¶
Target Completion: 30/09/2026
| Corrective Action Completed | Signature | Position | Date |
|---|---|---|---|
| Actioned by | |||
| Verification By |
Status: OPEN — owner Sean Ashton; target close 30/09/2026