Risk Assessment: Office Fire Safety

Document Reference: RA_HO_06
Issue Date: 04/07/2025
Review Date: 04/07/2026
Assessed By: HSQE Consultant Approved By: Aaron Mason

Task/Activity

Fire prevention and emergency response in office environments

Location

All office locations and home offices

Persons at Risk

  • Office staff
  • Visitors
  • Contractors
  • Neighbouring properties

Hazards and Controls

Hazard Existing Controls S L R Additional Controls S L R
Fire outbreak Fire risk assessment, detection systems 4 1 🟢 4 Enhanced detection, suppression systems 4 1 🟢 4
Smoke inhalation Smoke alarms, evacuation routes 4 1 🟢 4 Additional training, refuge areas 4 1 🟢 4
Blocked escape routes Monthly checks, clear routes policy 4 1 🟢 4 Quarterly drills, improved signage 4 1 🟢 4
Electrical fires PAT testing, equipment maintenance 3 2 🟡 6 Thermal imaging checks, arc fault detection 3 1 🟢 3
Combustible materials Storage procedures, housekeeping 3 2 🟡 6 Fire resistant cabinets, clear desk policy 3 1 🟢 3
Disabled person evacuation PEEPs in place, trained assistants 4 1 🟢 4 Evacuation chairs, refuge points 4 1 🟢 4
Fire spread between areas Fire doors, compartmentation 4 1 🟢 4 Door closers maintenance, seal checks 4 1 🟢 4
Arson Security measures, CCTV 3 1 🟢 3 Enhanced lighting, access control 3 1 🟢 3

PPE Requirements

  • Fire wardens: High visibility vests
  • Fire extinguisher training: Heat resistant gloves

Training Requirements

  • Fire awareness training
  • Fire warden training
  • Evacuation procedures
  • Fire extinguisher use
  • Assembly point procedures
  • PEEP implementation

Emergency Procedures

  • Fire evacuation plan
  • Assembly point procedures
  • Roll call process
  • Fire service liaison
  • Business continuity activation

Monitoring

  • Monthly alarm tests
  • Quarterly evacuation drills
  • Annual risk assessment review
  • Fire warden competency checks
  • Fire door inspections

Risk Assessment Summary

Risk Scoring Matrix

  • Severity (S): 1=Negligible, 2=Minor, 3=Serious, 4=Catastrophic
  • Likelihood (L): 1=Remote, 2=Unlikely, 3=Likely, 4=Almost Certain
  • Risk Rating: 🟢 Low (1-5), 🟡 Medium (6-11), 🔴 High (12-16)

Document Control

  • All risk assessments reviewed annually
  • Update following incidents or changes
  • Approved by senior management
  • Communicated to all relevant parties
  • APP_07 Hazard Identification Log
  • MAN01_INTEGRATED MANAGEMENT SYSTEM (IMS) MANUAL
  • APP_12 Training Matrix

These Risk Assessments form part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.