Corrective Action Report 006

A M Water Services Limited

QEHS/NCR Ref: OBS-IA202505-01
Date: 24/09/2025
CAR ID: CAR-2025-006 Document Number: FORM_CAR001 Rev 1 ID 01/09/2025

Process/Area/Department: Performance Evaluation / Analysis
Requirement/Clause No.(s): ISO 9001/14001/45001:2015 - Clause 9.1.3
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Classification: ☐ Nonconformity ☑ Observation ☐ Opportunity for Improvement

Details of Observation

Statement of Observation: Monthly KPI data collected and reviewed but formal analysis methodology relies on management experience rather than structured analytical approaches. S.O.P_6.1 could be enhanced with documented trend analysis techniques.

Planned Actions

Containment Action(s), including correction, with supporting completion date(s):

  1. Develop trend analysis template (30/11/2025)
  2. Train management team on statistical methods (31/12/2025)
  3. Implement structured analysis approach (31/01/2026)

Root Cause

Primary Cause: Reliance on experiential knowledge without documented methodology Contributing Factors: Small data volumes not requiring complex analysis

Proposed Corrective Action

  1. Create simple statistical process control charts for key metrics.
  2. Document analysis methods in S.O.P_6.1.
  3. Provide basic training on trend identification.

Verification

  1. [x] Three months of KPI reports using structured analysis — addressed by the control recorded at closure.
  2. [x] Evidence of trend identification leading to actions.

Points noted

  1. Excel templates for consistency
  2. Quarterly trend review sessions
  3. Visual dashboards for trends

Feedback & Acknowledgments

Management recognises value of structured approach for business growth.

Corrective Action Report Prepared By

CAR Prepared By Signature Position Date
Sean Ashton S. Ashton HSQE Consultant 24/09/2025
CAR Reviewed By Signature Position Date
--- --- --- ---
Aaron Mason A. Mason Director 24/09/2025

Corrective Action Close Out

Target Completion: 31/01/2026

Corrective Action Completed Signature Position Date
Actioned by S. Ashton HSQE Consultant 13/05/2026
Verification By S. Ashton HSQE Consultant 13/05/2026

Closure

Closed 13/05/2026. Superseded by 2026 KPI simplification (E3 carbon baseline live; B2 continuous-improvement programme) which prioritises honest measurability over statistical sophistication.

Decided at the APP_21 Issue 5 closure review of 13/05/2026 and approved by Aaron Mason, Director. Recorded on this report on 27/09/2026.

Owner of record: Sean Ashton (HSQE Consultant), as controller of audit-derived CARs under APP_21.

Verification outcome at 13/05/2026

# Verification criterion as written Outcome Basis
1 Three months of KPI reports using structured analysis. Alternative control adopted Structured statistical analysis was not adopted. The 2026 KPI set was simplified to measures AMWS can evidence, which was the decision taken instead.
2 Evidence of trend identification leading to actions. Met The 2025 Carbon Baseline published 12/05/2026 produced objective E3 in APP_11, which is a trend identified leading to an action.

Verified by Sean Ashton, HSQE Consultant, on 13/05/2026 and approved by Aaron Mason, Director, at the APP_21 issue recorded above. The close-out block is completed accordingly.

Status: CLOSED 13/05/2026 — Superseded by 2026 KPI simplification (E3 carbon baseline live; B2 continuous-improvement programme) which prioritises honest measurability over statistical sophistication.