Induction Process Procedure¶
Document Information
| Field | Value |
|---|---|
| Document Reference | IPP001 |
| Issue Date | 02/01/2026 |
| Next Review | 02/01/2027 |
| Controlled By | Leanne Mason (Director — Finance/Admin) |
| Approved By | Aaron Mason, Managing Director |
What this is
The controlled procedure for inducting new starters at A M Water Services Ltd. Covers initial onboarding through to first-day-on-site, role-specific competency verification, and the induction-acknowledgement record. Maps to Achilles UVDB B2.5.1 (training and capability) and ISO 45001 7.2 (competence).
Related documents¶
- HS_FM_25 Induction Checklist — the digital form completed at the end of induction
- RP001 Recruitment Procedure — what happens before induction
- Right-to-Work Procedure (PROC_R2W_01) — statutory check during induction
- Job Description Register — role-specific competencies
- APP_12 Training Matrix — qualifications required per role
- POL_HSQE_17 Illegal Workers