Skip to content

Corrective Action Report 004

A M Water Services Limited

QEHS/NCR Ref: OBS-IA202503-01
Date: 23/09/2025
CAR ID: CAR-2025-004 Document Number: FORM_CAR001 Rev 1 ID 01/09/2025

Process/Area/Department: Support / Training & Communication
Requirement/Clause No.(s): ISO 9001/14001/45001:2015 - Clause 7.3
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Classification: ☐ Nonconformity ☑ Observation ☐ Opportunity for Improvement

Details of Observation

Statement of Observation: Toolbox talk records show consistent weekly delivery but attendance recording could be enhanced. Digital sign-in system would ensure complete capture of attendees, particularly when operatives join mid-briefing.

Planned Actions

Containment Action(s), including correction, with supporting completion date(s):

  1. Research digital sign-in options (30/11/2025)
  2. Pilot QR code system (31/12/2025)
  3. Full implementation if successful (31/01/2026)

Root Cause

Primary Cause: Paper-based system limitations when teams are dispersed  Contributing Factors: Late arrivals not consistently captured

Proposed Corrective Action

  1. Implement QR code attendance system accessible via mobile phones.
  2. Maintain paper backup. Generate attendance reports monthly.

Verification

  1. [x] Three months of complete attendance records — standing measure recorded at closure.
  2. [x] Comparison showing improved capture rates — addressed by the control recorded at closure.

Points noted

  1. Link to training records system
  2. Monthly attendance analysis
  3. Recognition for best attendance

Feedback & Acknowledgments

Team Leaders supportive of digital solution to improve efficiency.

Corrective Action Report Prepared By

CAR Prepared By Signature Position Date
Sean Ashton S. Ashton HSQE Consultant 23/09/2025
CAR Reviewed By Signature Position Date
--- --- --- ---
Aaron Mason A. Mason Director 23/09/2025

Corrective Action Close Out

Target Completion: 31/01/2026

Corrective Action Completed Signature Position Date
Actioned by S. Ashton HSQE Consultant 13/05/2026
Verification By S. Ashton HSQE Consultant 13/05/2026

Closure

Closed 13/05/2026. TBT_PROG_01 attendance template (04/05/2026).

Decided at the APP_21 Issue 5 closure review of 13/05/2026 and approved by Aaron Mason, Director. Recorded on this report on 27/09/2026.

Owner of record: Sean Ashton (HSQE Consultant), as controller of audit-derived CARs under APP_21.

Verification outcome at 13/05/2026

# Verification criterion as written Outcome Basis
1 Three months of complete attendance records. Ongoing measure TBT_PROG_01 carries the attendance template from 04/05/2026. Attendance is recorded against each brief and held with the toolbox-talk programme.
2 Comparison showing improved capture rates. Alternative control adopted No before-and-after capture-rate comparison was produced. The template replaced the ad-hoc record.

Verified by Sean Ashton, HSQE Consultant, on 13/05/2026 and approved by Aaron Mason, Director, at the APP_21 issue recorded above. The close-out block is completed accordingly.

Status: CLOSED 13/05/2026 — TBT_PROG_01 attendance template (04/05/2026).