Skip to content

Risk Assessment: Manual Handling

Document Reference: RA_HO_07
Issue Date: 04/07/2025
Review Date: 04/07/2026
Assessed By: HSQE Consultant Approved By: Aaron Mason

Task/Activity

Manual handling of office equipment, deliveries, and materials

Location

All work locations

Persons at Risk

  • All staff
  • Delivery personnel
  • Contractors

Hazards and Controls

Hazard Existing Controls S L R Additional Controls S L R
Back injuries from lifting Manual handling training, team lifting policy 3 2 🟡 6 Refresher training, lifting aids 2 1 🟢 2
Strains from poor technique Training provided, guidance posters 3 2 🟡 6 Mechanical aids assessment, technique monitoring 2 1 🟢 2
Repetitive strain injuries Job rotation, rest breaks 2 2 🟢 4 Automated solutions, ergonomic tools 2 1 🟢 2
Crushing injuries from dropped items Safety footwear, secure grip training 3 2 🟡 6 Team lifting protocols, load assessment 2 1 🟢 2
Slips/trips while carrying Good housekeeping, clear routes 3 2 🟡 6 Route planning, obstruction removal 2 1 🟢 2
Awkward postures Ergonomic training, adjustable equipment 2 3 🟡 6 Workplace design review, handling aids 2 2 🟢 4
Inadequate grip/sharp edges Gloves provided, inspection procedures 2 2 🟢 4 Edge protection, better packaging 2 1 🟢 2
Environmental conditions Weather monitoring, postponement policy 2 2 🟢 4 Indoor storage, covered areas 2 1 🟢 2

PPE Requirements

  • Safety footwear
  • Work gloves
  • Back support (if recommended)
  • High visibility vest (loading areas)

Training Requirements

  • Manual handling techniques
  • Risk assessment
  • Use of mechanical aids
  • Body mechanics
  • Injury prevention
  • Load assessment

Emergency Procedures

  • First aid procedures
  • Injury reporting
  • Occupational health referral
  • Return to work process
  • Rehabilitation support

Monitoring

  • Technique observations
  • Injury statistics
  • Training records
  • Equipment maintenance
  • Near miss reports

Risk Assessment Summary

Risk Scoring Matrix

  • Severity (S): 1=Negligible, 2=Minor, 3=Serious, 4=Catastrophic
  • Likelihood (L): 1=Remote, 2=Unlikely, 3=Likely, 4=Almost Certain
  • Risk Rating: 🟢 Low (1-5), 🟡 Medium (6-11), 🔴 High (12-16)

Document Control

  • All risk assessments reviewed annually
  • Update following incidents or changes
  • Approved by senior management
  • Communicated to all relevant parties
  • APP_07 Hazard Identification Log
  • MAN01_INTEGRATED MANAGEMENT SYSTEM (IMS) MANUAL
  • APP_12 Training Matrix

These Risk Assessments form part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.