Corrective Action Report 001

A M Water Services Limited

QEHS/NCR Ref: OBS-IA202601-01
Date: 28/04/2026
CAR ID: CAR-2026-001 Document Number: FORM_CAR001 Rev 1 ID 01/09/2025

Process/Area/Department: Context & Leadership / Management Systems
Requirement/Clause No.(s): ISO 9001/14001/45001:2015 - Clause 4.1
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Classification: ☐ Nonconformity ☑ Observation ☐ Opportunity for Improvement

Details of Observation

Statement of Observation: Rolled forward from CAR-2025-001. The standing weekly Director / HSQE compliance call covers operational and stakeholder context informally and effectively, but there is no brief written capture of context updates between the formal 6-monthly APP_01 reviews, so no record of them exists.

Planned Actions

Containment Action(s), including correction, with supporting completion date(s):

  1. Add a 2-line "context updates" item to the standing weekly-call notes (30/06/2026)
  2. Continue the 6-monthly APP_01 formal review unchanged

Root Cause

Primary Cause: Context monitoring runs through an effective informal forum (the weekly call) but was never given a lightweight written-capture mechanism. Contributing Factors: Small-company habits — context discussed verbally, not minuted.

Proposed Corrective Action

  1. Implement a light-touch monthly context capture in the weekly-call notes.
  2. First evidence: the May 2026 weekly-call notes, reviewed at the next standing call.

Verification

  1. [x] Written context-update line present in weekly-call notes from May 2026.
  2. [x] 6-monthly APP_01 formal review confirmed unchanged.

Points noted

  1. Keep the capture deliberately light — two lines, not a report.
  2. Roll the monthly notes into the September Management Review context input.

Feedback & Acknowledgments

Raised by the 2026 internal-audit cycle (IA202601). Owner and target agreed at the standing weekly Director / HSQE compliance call.

Corrective Action Report Prepared By

CAR Prepared By Signature Position Date
Sean Ashton S. Ashton HSQE Consultant 28/04/2026
CAR Reviewed By Signature Position Date
--- --- --- ---
Aaron Mason A. Mason Director 28/04/2026

Corrective Action Close Out

Target Completion: 30/06/2026

Corrective Action Completed Signature Position Date
Actioned by S. Ashton HSQE Consultant 09/09/2026
Verification By S. Ashton HSQE Consultant 09/09/2026

Closure

APP_01 Issue 4 carries a dated review record with inputs and outputs for all thirteen interested parties, and the review cadence has been restated to the one AMWS actually runs — twice-yearly for Critical and High parties, annually for Medium and Low, and by exception at the weekly call on FORM_WCC_01.

Owner of record: Sean Ashton (HSQE Consultant), as controller of audit-derived CARs under APP_21.

Verification outcome at 09/09/2026

# Verification criterion as written Outcome Basis
1 Written context-update line present in weekly-call notes from May 2026. Met Interim context monitoring is recorded in the weekly Director / HSQE call notes from May 2026.
2 6-monthly APP_01 formal review confirmed unchanged. Met APP_01 Issue 4 carries the review record.

Verified by Sean Ashton, HSQE Consultant, on 09/09/2026 and approved by Aaron Mason, Director, at the APP_21 issue recorded above. The close-out block is completed accordingly.

Recorded in APP_21, which is the controlled non-conformance register.

Status: CLOSED 09/09/2026 — owner Sean Ashton; target close was 30/06/2026