Risk Assessment: Contractor Management¶
Document Reference: RA_HO_13
Issue Date: 04/07/2025
Review Date: 04/07/2026
Assessed By: HSQE Consultant
Approved By: Aaron Mason
Task/Activity¶
Management and supervision of contractors
Location¶
All company and client sites
Persons at Risk¶
- Contractors
- Company staff
- Site visitors
- Public
Hazards and Controls¶
| Hazard | Existing Controls | S | L | R | Additional Controls | S | L | R |
|---|---|---|---|---|---|---|---|---|
| Unsafe work practices | Approved contractor list, method statements | 2 | 2 | 🟢 4 | Contractor portal, competency verification | 2 | 1 | 🟢 2 |
| Inadequate insurance | Insurance checks, minimum requirements | 2 | 2 | 🟢 4 | Annual reviews, claims history checks | 2 | 1 | 🟢 2 |
| Quality issues | Work inspections, sign-off procedures | 2 | 2 | 🟢 4 | Performance monitoring system, KPIs | 2 | 1 | 🟢 2 |
| Communication failures | Site inductions, point of contact | 2 | 2 | 🟢 4 | Contractor handbook, regular meetings | 2 | 1 | 🟢 2 |
| Competency gaps | Qualification checks, references | 3 | 2 | 🟡 6 | Skills matrix, training verification | 2 | 1 | 🟢 2 |
| Interface risks | Coordination meetings, permits | 3 | 2 | 🟡 6 | Simultaneous operations procedure | 2 | 1 | 🟢 2 |
| Emergency response | Briefings, contact details | 3 | 2 | 🟡 6 | Joint drills, integrated procedures | 2 | 1 | 🟢 2 |
| Non-compliance | Supervision, enforcement | 2 | 2 | 🟢 4 | Performance bonds, regular audits | 2 | 1 | 🟢 2 |
PPE Requirements¶
- As per site requirements
- Visitor PPE provision
Training Requirements¶
- Contractor management
- CDM regulations
- Permit systems
- Site supervision
- Performance management
- Legal requirements
Emergency Procedures¶
- Contractor incident response
- Work stop authority
- Investigation procedures
- Insurance claims
- Contract termination
- Escalation process
Monitoring¶
- Contractor audits
- Performance reviews
- Incident statistics
- Compliance checks
- Feedback systems
- Permit compliance
Risk Assessment Summary¶
Risk Scoring Matrix¶
- Severity (S): 1=Negligible, 2=Minor, 3=Serious, 4=Catastrophic
- Likelihood (L): 1=Remote, 2=Unlikely, 3=Likely, 4=Almost Certain
- Risk Rating: 🟢 Low (1-5), 🟡 Medium (6-11), 🔴 High (12-16)
Document Control¶
- All risk assessments reviewed annually
- Update following incidents or changes
- Approved by senior management
- Communicated to all relevant parties
Related Documents¶
- APP_07 Hazard Identification Log
- MAN01_INTEGRATED MANAGEMENT SYSTEM (IMS) MANUAL
- APP_12 Training Matrix
These Risk Assessments form part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.