Risk Assessment: Contractor Management

Document Reference: RA_HO_13
Issue Date: 04/07/2025
Review Date: 04/07/2026
Assessed By: HSQE Consultant Approved By: Aaron Mason

Task/Activity

Management and supervision of contractors

Location

All company and client sites

Persons at Risk

  • Contractors
  • Company staff
  • Site visitors
  • Public

Hazards and Controls

Hazard Existing Controls S L R Additional Controls S L R
Unsafe work practices Approved contractor list, method statements 2 2 🟢 4 Contractor portal, competency verification 2 1 🟢 2
Inadequate insurance Insurance checks, minimum requirements 2 2 🟢 4 Annual reviews, claims history checks 2 1 🟢 2
Quality issues Work inspections, sign-off procedures 2 2 🟢 4 Performance monitoring system, KPIs 2 1 🟢 2
Communication failures Site inductions, point of contact 2 2 🟢 4 Contractor handbook, regular meetings 2 1 🟢 2
Competency gaps Qualification checks, references 3 2 🟡 6 Skills matrix, training verification 2 1 🟢 2
Interface risks Coordination meetings, permits 3 2 🟡 6 Simultaneous operations procedure 2 1 🟢 2
Emergency response Briefings, contact details 3 2 🟡 6 Joint drills, integrated procedures 2 1 🟢 2
Non-compliance Supervision, enforcement 2 2 🟢 4 Performance bonds, regular audits 2 1 🟢 2

PPE Requirements

  • As per site requirements
  • Visitor PPE provision

Training Requirements

  • Contractor management
  • CDM regulations
  • Permit systems
  • Site supervision
  • Performance management
  • Legal requirements

Emergency Procedures

  • Contractor incident response
  • Work stop authority
  • Investigation procedures
  • Insurance claims
  • Contract termination
  • Escalation process

Monitoring

  • Contractor audits
  • Performance reviews
  • Incident statistics
  • Compliance checks
  • Feedback systems
  • Permit compliance

Risk Assessment Summary

Risk Scoring Matrix

  • Severity (S): 1=Negligible, 2=Minor, 3=Serious, 4=Catastrophic
  • Likelihood (L): 1=Remote, 2=Unlikely, 3=Likely, 4=Almost Certain
  • Risk Rating: 🟢 Low (1-5), 🟡 Medium (6-11), 🔴 High (12-16)

Document Control

  • All risk assessments reviewed annually
  • Update following incidents or changes
  • Approved by senior management
  • Communicated to all relevant parties
  • APP_07 Hazard Identification Log
  • MAN01_INTEGRATED MANAGEMENT SYSTEM (IMS) MANUAL
  • APP_12 Training Matrix

These Risk Assessments form part of A M Water Services Limited's Integrated Management System and should be read in conjunction with the IMS Manual (MAN_01) and relevant Standard Operating Procedures.