Corrective Action Report 002

A M Water Services Limited

QEHS/NCR Ref: OBS-IA202502-01
Date: 22/09/2025
CAR ID: CAR-2025-002 Document Number: FORM_CAR001 Rev 1 ID 01/09/2025

Process/Area/Department: Planning / Management Systems
Requirement/Clause No.(s): ISO 9001/14001/45001:2015 - Clause 6.3
Type: ☑ Internal Audit ☐ Client Audit ☐ Inspection ☐ Complaint ☐ Sub-contractor ☐ Certification Review
Classification: ☐ Nonconformity ☑ Observation ☐ Opportunity for Improvement

Details of Observation

Statement of Observation: S.O.P_5.2 Management of Change provides robust framework but evidence of formal change assessments for recent organisational updates (Q4 2025 digital systems) could be strengthened. Process followed informally but documentation would enhance traceability.

Planned Actions

Containment Action(s), including correction, with supporting completion date(s):

  1. Create simple one-page change request form (31/10/2025)
  2. Brief management team on form usage criteria (15/11/2025)
  3. Implement for Q4 digital system changes as pilot (30/11/2025)

Root Cause

Primary Cause: Small company size enables informal change management  Contributing Factors: Documentation requirements not clearly defined for different change types

Proposed Corrective Action

  1. Develop change request form template.
  2. Define thresholds for formal documentation.
  3. Include in monthly management review checklist.

Verification

  1. [x] Completed change forms for 3 different changes — addressed by the control recorded at closure.
  2. [x] Evidence of form use in Q4 system implementation — addressed by the control recorded at closure.

Points noted

  1. Create change register for tracking
  2. Link to risk assessment updates
  3. Quarterly review of change effectiveness

Feedback & Acknowledgments

Management team supportive. IT changes to be used as pilot implementation.

Corrective Action Report Prepared By

CAR Prepared By Signature Position Date
Sean Ashton S. Ashton HSQE Consultant 22/09/2025
CAR Reviewed By Signature Position Date
--- --- --- ---
Aaron Mason A. Mason Director 22/09/2025

Corrective Action Close Out

Target Completion: 30/11/2025

Corrective Action Completed Signature Position Date
Actioned by S. Ashton HSQE Consultant 13/05/2026
Verification By S. Ashton HSQE Consultant 13/05/2026

Closure

Closed 13/05/2026. 2025–26 IMS rebuild demonstrably exercised SOP 5.2.

Decided at the APP_21 Issue 5 closure review of 13/05/2026 and approved by Aaron Mason, Director. Recorded on this report on 27/09/2026.

Owner of record: Sean Ashton (HSQE Consultant), as controller of audit-derived CARs under APP_21.

Verification outcome at 13/05/2026

# Verification criterion as written Outcome Basis
1 Completed change forms for 3 different changes. Alternative control adopted No separate change forms were raised. SOP 5.2 was exercised through the 2025-26 IMS rebuild, and the evidence sits in the revision histories of the documents it reissued rather than on a change form.
2 Evidence of form use in Q4 system implementation. Alternative control adopted For the same reason, no form-use evidence exists for the Q4 implementation.

Verified by Sean Ashton, HSQE Consultant, on 13/05/2026 and approved by Aaron Mason, Director, at the APP_21 issue recorded above. The close-out block is completed accordingly.

Status: CLOSED 13/05/2026 — 2025–26 IMS rebuild demonstrably exercised SOP 5.2.