Document Information
| Field | Value |
|---|---|
| Document Reference | APP_27 |
| Issue Number | 2 |
| Issue Date | 30 September 2026 |
| Next Review | 22 September 2027 |
| Controlled By | Sean Ashton (HSQE Consultant) |
| Approved By | Aaron Mason, Director |
The record sheet
The audit is carried out on FORM_HCA_01 — HSQE Culture Audit Record. This page is the programme, the method and the register of cycles run.
Related: APP_11 HSQE Objectives & KPIs · APP_20 Internal Audits Programme · APP_21 Non-Conformance Register · APP_22 Accident Statistics
1. Why this register exists¶
AMWS audits its site work thoroughly. Between supervisor inspections, van pack checks, permit close-outs, COSHH control audits and the internal audit programme, twenty field teams are looked at from several directions.
Nothing audits the office.
That matters for two reasons. The first is plain conformity: the notice board, the fire log, the first aid provision, the COSHH cabinet, the DSE assessments and the records themselves all live in the office, and nobody has been checking them on a cycle.
The second is leadership visibility. If the directors submit their own workplace to the same scrutiny they ask of a ganger in a trench, that is visible to everyone. Auditing the office demonstrates that the rules apply to the directors as well.
What this replaces¶
The H&S Culture Survey was adopted as the replacement for the retired Director Site-Tours programme and was targeted to issue its first cycle on 31/08/2026. It did not issue. For the period since, the formal mechanism for capturing workforce sentiment and leadership visibility had been withdrawn and not replaced.
This register replaces it. The two differ as follows:
| H&S Culture Survey | HSQE Culture Audit | |
|---|---|---|
| Method | Anonymous questionnaire issued and collected | Physical audit of the office with a director present, plus questions asked face to face |
| What it produces | A response rate and a set of scores | A dated record, findings with owners, and conversations that happened |
| Failure mode | Nobody returns it, and the gap is invisible until the response rate is counted | A cycle either ran on the date or it did not |
| Leadership signal | The directors ask the workforce what it thinks | The directors put their own workplace under audit |
Decision recorded at the September 2026 Management Review. The survey is withdrawn; this is the mechanism that carries objective B1 forward. B3 was merged into B1 at APP_11 Issue 4 on 09/09/2026, so the survey’s objective already sat there.
This is not a substitute for consultation
Clause 5.4 of ISO 45001 requires consultation and participation of workers, which is a continuing arrangement, not a quarterly check. That is answered by the toolbox-talk programme, the WhatsApp Works group and the weekly Director / HSQE call recorded on FORM_WCC_01.
This audit answers Clause 9.1 monitoring. It measures whether those arrangements are working and whether the office itself conforms. The two are recorded separately and should not be presented as one.
2. How the audit works¶
The audit is run quarterly and takes about 45 minutes. It is carried out by the HSQE Consultant with a director present for the whole of it, and that presence is required.
The sheet has two halves, and they are different kinds of evidence.
Half one — conformity¶
Twelve physical checks on the office and yard. These are pass or fail and they are looked at, not asked about.
Half two — culture¶
Three questions asked face to face, of whoever is in that day, and written down in the words they use. The answers are not anonymous and are not scored.
The culture half exists mainly to address one number. Near-miss and close-call reporting has stood at zero for three years (APP_22). That is an absence of data rather than an absence of events, and it is objective H4. Asking people directly why they do not report is the best route AMWS has to understanding it.
Scoring¶
| Meaning | Action | |
|---|---|---|
| 🟢 Compliant | All applicable checks pass | Record and move on |
| 🟡 Minor finding | Something needs correcting — a date, a missing copy, a board out of date | Fix within 30 days, recorded here |
| 🔴 Major finding | A statutory duty is not being met, or a control relied on is absent | Raise in APP_21 with an owner and a date |
| ⬛ Not audited | Not covered this cycle | — |
A culture answer is never scored. It is recorded verbatim and it either drives an action or it does not.
3. Frequency¶
| Cycle | Quarter | Target month | Who |
|---|---|---|---|
| Q3 2026 | Jul–Sep | September 2026 — run 22/09/2026 | Sean Ashton + Leanne Mason |
| Q4 2026 | Oct–Dec | December 2026 | Sean Ashton + a director |
| Q1 2027 | Jan–Mar | March 2027 | Sean Ashton + a director |
| Q2 2027 | Apr–Jun | June 2027 | Sean Ashton + a director |
Quarterly is proportionate for a two-unit office with four office-based staff. It is also frequent enough that a finding cannot sit for a year, which is what went wrong with the annual survey.
The audit is run on the monthly Onyx site visit in the target month, so it does not require a separate journey.
4. Register of cycles¶
| Cycle | Date | Auditor | Director present | Result | Findings | Record |
|---|---|---|---|---|---|---|
| Q3 2026 | 22/09/2026 | Sean Ashton | Leanne Mason | 🟡 Minor findings | 2, both closed | ONX-AMWS-HSI-2026-01 |
| Q4 2026 | — | — | — | ⬛ Not yet due | ||
| Q1 2027 | — | — | — | ⬛ Not yet due | ||
| Q2 2027 | — | — | — | ⬛ Not yet due |
Q3 2026 — the culture answers¶
Recorded on the visit of 22/09/2026. The conformity half was taken alongside the premises inspection, and the report at ONX-AMWS-HSI-2026-01 is the evidence for it.
| Question | Recorded |
|---|---|
| Who is the health and safety contact here, and how would you reach them? | The WhatsApp Works group day to day, in both directions. Competence and the office arrangements are held directly by Leanne Mason, Director |
| When did a director last attend a toolbox talk or walk a job with you? | Not recorded at this cycle. Put at Q4 |
| Has anyone here reported a near miss? What happened after they did? | Not recorded at this cycle. Put at Q4, and it is the first question on the sheet |
5. Findings log¶
| Ref | Cycle | Finding | Grade | Owner | Target | Status |
|---|---|---|---|---|---|---|
| HCA-01 | Q3 2026 | DSE assessments not on file for the two office workstations at the date of the cycle | 🟡 | Leanne Mason | 30/09/2026 | Closed 27/09/2026 — both office workstations assessed |
| HCA-02 | Q3 2026 | The weekly alarm test and the monthly emergency lighting test had no record to be kept on | 🟡 | Sean Ashton | 31/10/2026 | Closed 01/10/2026 — FORM_FIRE_LOG_01 issued |
Any 🔴 finding is also raised in APP_21. Minor findings are tracked here and closed here.
6. What this feeds¶
| Destination | What goes there |
|---|---|
| APP_11 objective B1 | That the cycle ran on time, and what it found |
| APP_11 objective H4 | The reporting answers from the culture half — the only direct evidence AMWS has on why near-miss reporting is at zero |
| APP_21 | Any major finding |
| Management review | The cycle results, as a Clause 9.3 input |
| APP_22 | Anything the culture half reveals about the reporting route |
7. Responsibilities¶
| Who | What |
|---|---|
| Sean Ashton (HSQE Consultant) | Runs the audit, completes FORM_HCA_01, maintains this register, raises findings |
| A director — Aaron or Leanne Mason | Present for the whole audit. Answers for anything found in the office |
| Leanne Mason (Director) | Owns the office arrangements being audited and closes minor findings |
| Aaron Mason (Director) | Reviews the cycle results at management review |
8. Related documents¶
- FORM_HCA_01 — HSQE Culture Audit Record — the sheet
- FORM_WCC_01 — Weekly Compliance Call — the Clause 5.4 consultation record
- APP_26 — COSHH Assessment Audit Register — the same idea applied to COSHH controls
- APP_20 — Internal Audits Programme — the Clause 9.2 programme this sits alongside, not inside
- POL_HSQE_16 — Health & Safety Policy
- SOP 2.2 — Communication, Consultation & Worker Participation
9. Audit trail¶
| Issue | Date | Approved By | Summary |
|---|---|---|---|
| 2 | 30/09/2026 | Aaron Mason, Director | First cycle recorded at Section 4 and its finding at Section 5. The conformity half was taken on the visit of 22/09/2026 alongside the premises inspection ONX-AMWS-HSI-2026-01 and the certificate-currency check. The cycle, its two findings and the culture answers are recorded on this page. Two of the three culture questions are carried to the Q4 cycle. |
| 1 | 22/09/2026 | Aaron Mason, Director | Register created. Adopted at the September 2026 Management Review as the replacement for the H&S Culture Survey, which was withdrawn without having issued a cycle. Carries objective B3 forward and adds a direct route at objective H4. |