Performance

Monitoring, measurement, analysis and evaluation under ISO 9001, 14001 and 45001 Clause 9, and the improvement that follows under Clause 10.

Framework Details
Objectives measured 7 across APP_11 — 6 on track, 1 watch
Internal audits completed 32 across two cycles — 16 in 2026, 16 in 2025
Corrective actions raised 41 — 32 closed, 9 open (APP_21)
Management reviews on record 3 — Sep 2025, May 2026 interim, Sep 2026 annual
Improvement projects 1 open (IAF register)
Controlled By Sean Ashton (HSQE Consultant)
Approved By Aaron Mason, Director

The headline, stated plainly

Reactive performance is excellent. Proactive performance is not working.

Across three years of excavation, confined-space and highway working, twenty field teams have recorded zero RIDDOR reportables, zero lost-time injuries, zero dangerous occurrences and zero road traffic accidents.

Against that, near-miss and close-call reporting has stood at zero for three years. Teams working in trenches, on live carriageways and around live mains generate near misses. None have been reported, so the reporting route is not being used. It is objective H4 in APP_11, owned by Sean Ashton and Jason May. The full analysis is in APP_22.

Objectives & KPIs

Clause 6.2 sets them; Clause 9.1 measures them.

Ref Measure Position
Q2 Major non-conformities at external audit On track
H1 RIDDOR reportables · lost-time injuries · dangerous occurrences · RTAs On track — zero across all four
H4 Near misses and close calls captured through the Works group and the operational NCR register On track — both routes live, reviewed weekly
E1 Environmental incidents On track
E3 Carbon, tCO₂e Scope 1 + 2 Watch — measured at year end
B2 Notifiable data breaches; Cyber Essentials On track
B1 HSQE Culture Audit cycles run to programme On track — first cycle 22/09/2026

The register is at APP_11.

Health and Safety Inspections

Independent inspection of the premises by the HSQE consultant, under Clause 9.1 and SSIP Core Criterion 6. The premises, the yard, the welfare unit and the vehicles; operational activity is covered by the van pack RAMS, APP_20 and APP_10.

Round Result Findings Record
22/09/2026 — baseline 81 of 81 applicable questions met 0 requiring corrective action; 2 observations H&S Inspections — Premises

HSQE Culture Audit

Quarterly audit of the office and yard with a director present, plus questions asked face to face. It measures whether the consultation routes are working, under Clause 9.1. The programme and the register of cycles are at APP_27.

Cycle Date Result Report Register
Q3 2026 — first cycle 22/09/2026 🟡 Minor findings, both closed ONX-AMWS-HSI-2026-01 APP_27
Q4 2026 December 2026 ⬛ Not yet due

Environmental Performance

Document Reference What it holds
Environmental performance overview — How the three below fit together and which KPIs they feed
Carbon Baseline 2025 CARB_BASELINE_2025 The Scope 1 + 2 baseline that E3 is measured against
Sustainability Note 2025 SUS_NOTE_2025 The sustainability position and commitments
Recycling Initiatives RECYC_NOTE_2025 Waste diversion activity feeding E2

Audits & Management Review

Clause 9.2 internal audit; Clause 9.3 management review.

Area Where it is What it holds
Audits overview Audits How the programme is planned, run and closed out
Internal audit programme APP_20 Both cycles — area, ISO clauses, auditor, findings
Internal audits 2026 IA202601–IA202616 Sixteen audits covering the full clause set
Internal audits 2025 IA202501–IA202516 The prior cycle, retained as evidence
Corrective actions APP_21 All 40 CARs with owner, target and closure status
CAR records 2026 CAR-2026-001 onward Seventeen records
CAR records 2025 CAR-2025-001 onward Twenty-three records
Management review Overview Agendas, input packs and outputs
External audits External Certification and customer audit history

Incidents and improvement

Incidents, corrective action and continual improvement are Clause 10, and are held in Improvement. The performance figures they produce are reported here and in APP_22 Accident Statistics.


Operation — the controls · Improvement — what follows